PAR02 Data Centre

Goodman PAR02 Data Centre, Sud de Paris, les deux bâtiments avec large installation photovoltaïque en toiture
PAR02 Data Centre

34 Rue Louis Armand, Villeneuve-Saint-Georges, 94190, France

Surface:
Type: Centre de données
Disponibilité: Disponible
Enabler of the digital economy. 

Goodman PAR02 Data Centre is the 108 MW IT campus located in the South of Paris

Up to 108 MW IT campus

200 MW capacity

110,000 sqm plot size
108 MW Puissance IT
Fibre
Vidéosurveillance

Redevelopment of the former electronic industrial manufacturing plant, carried out through a circular deconstruction process

SIZEABLE AND SUSTAINABLE

Thanks to its proximity to major infrastructure hubs, competitive power access, and strong network connectivity, Southern Paris is a strategic hub for cloud and IT service providers.

The Goodman PAR02 Data Centre is developed in the South of Paris, on a 110,000 sqm plot that has benefitted from a circular deconstruction process for maximum sustainability. This 108 MW IT Campus is located within close proximity to the centre of Paris market enabling a low-latency connection and a secured IT environment.

Thoughtfully designed with two distinct buildings, each proposes its own entrance, modern office areas, a technical equipment room, and mechanical/power yard.


Connectivity, power and low risk for data centre operations

  • 160 MW power capacity secured
  • Direct connection to fibre network available at the plot
  • International Tiers 1 fibre carriers such as EuNEtworks, Orange, SFR, Zayo in close proximity
  • Low risk profile location outside of flooding and earthquake zones, as well as flight corridors from Paris Orly airport
  • No hazardous uses, high-risk industrial businesses or gas stations located in the immediate neighbourhood.

Technical specifications

  • 108 MW IT: 54 MW IT per building. Potential for an additional 22–28 MW IT
  • On-site high voltage substation (225kV – 20kV)
  • Tiers 3 compliant design
  • 2 tons floor load per sqm
  • Clear height: 5.6m  
  • Entrance with rejection scheme.

Sustainability

We want our data centres to stand the test of time while minimising their environmental impact. Beyond transforming a brownfield site, PAR02 will be a GreenSpace+ property, including the following sustainability features:

  • Green building certification foreseen (LEED platinum targeted)
  • Waste heat recovery ready
  • High-quality outdoor facilities to support employee wellbeing
  • EV parking
  • Green roofs and PV installation on office buildings and ancillary buildings
  • Design includes efficient and state-of-the-art technical installations, including waterless cooling, resulting in a low PuE lowering electrical consumption 
  • Circular deconstruction reached 99.2% overall recovery rate, thanks to:

– Direct reemployment of items by local companies or associations

– Recycling materials

– Materials being recovered for energy purposes to replace non-renewable fossil fuels